Windfarm Park Enercon Casimcea


2013

Pile Testing and Foundation Casimcea Windfarm Park Enercon

Windfarm Park Enercon, Casimcea, Romania

The Verbund company was building a Windfarm Park in Casimcea, Dobro-
gea Area. Bauer, together with de-
signer company Saidel Engineering, performed an instrumented test on a 620 mm test pile for the final design of the piles by doing compression and horizontal tests with strain gages and inclinometer measurements. Later on, Bauer used a BG 15 for the in-
stallation of foundation piles for 15 nos. wind generators, dia. 1000 mm embedded 2-3 m in green schist rock with Rck>80 MPa.